I would like to be able to configure the system so that past schedule periods on a schedule do not trigger and launch cases when a schedule has been linked to a case process.
The scenario is that if there is an existing case process and i change the schedule to something else and set it live, i do not want all the past periods to create cases.
Kamal Saran
complete
Hi,
Do you know what, this is ready to use now.
We’d love to know what you think! A production release 2023.2 including this is ready.
You can also check out the full content of the release at https://docs.enate.net/whats-new/
Please discuss accessing a 2023.2 production release with the Enate Customer Success team.
Thanks,
Kamal Saran